We are having another trail day April 12th on Peckerhead. This will complete preliminary trail work on the Puntledge Plunge->Peckerhead. We are meeting at the Dam at 10am and heading up Br21 from there. We will be walking down KMA and Transmission to get to the spot. There is a lot of cedar in the area for use as cribbing. There should be at least 2 chainsaws there as well this time. Tell all your friends and lets have a good time fixing up this great trail.
Theme design is Mira 2007 by Chris Lotter.